Using and execution points

Important tips:
1- Avoid damages to the pipes end points.
2- Never use damaged pipes.
3- Avoid rotating the pipes and connecting after welding.
4- Protect the pipes against sudden impact and falling the tools on pipes.
5- Never apply paste and thread seal tapes for brass fittings.
6- Avoid placing the pipes and fittings in direct sunlight and frost.
7- The clients are kindly requested not to accept any projects before pressure test with positive results. Under negative circumstances, producer shall have no responsibility.
8- Apply metal tools to fasten metallic fittings.
9- Do not weld B.S pipes and fittings to other pipe and fittings.

nasb

Connection method for POOYAN BASPAR SEPAHAN pipe and fittings
B.S pipe and fittings are connected to each other by fusion welding based on DIN and DVS standards.
1- Consider the welding table data as the base.
2- Thoroughly clean the body and molds of welding machine as well as the applied pipe and fittings.
3- Connect suitable molds to the welding machine.
4- Connect the machine to power and adjust heating temperature to 260*10°C.
5- After warming up, cut the pipes vertically by means of scissors and clean the cut points.
6- Place pipe and fitting on the mold simultaneously and remove them after warming time and connect to each other without rotation (pay attention to the warming time and welding depth).
7- Connection is ready for use after cooling period.
8- After around 2 or 3 hours from the latest welding process, project will be ready for pressure tests.
- It is recommended to do pressure test on welded pipe and fittings under app. 15-20bar.
9- Upon welding completion, machine must be clean for further use.

 

Boiling specifications of Pooyan Baspar Sepahan pipes based on DIN 8077 of Germany

Weight
(kg/m)

Internal dia.
(mm)

Wall thickness
(mm)

Average dia.
(Inch)

Pipe outer dia.
(mm)

0/110 10/6 2/7 3/8 16
0/172 13/2 3/4 1/2 20
0/266 16/6 4/2 3/4 25
0/434 21/2 5/4 1/0 32
0/671 26/6 6/7 11/4 40
1/050 33/2 8/4 11/2 50
1/650 42/0 10/5 2/0 63
2/340 50/0 12/5 21/2 75
2/360 60/0 15/0 3/0 90
5/040 73/2 18/4 4/0 110

 

Boiling specifications of Pooyan Baspar Sepahan pipes based on DVS 2207 of Germany

Cooling time

(s)

Boiling time

(s)

Warming time

(s)

Boiling depth

(mm)

Pipe diameter

(mm)

2 4 5 13 16
2 4 5 14 20
2 4 7 15 25
4 6 8 16.5 32
4 6 12 18 40
4 6 18 20 50
6 8 24 24 63
8 8 30 25 75
8 8 40 29 90
8 10 50 32.5 110

 

 

Pipe outer dia.
(mm)

The distance between the wall mounting according to the water temperature inside the pipe (cm)
20C 30C  40C 50C  60C 70C 80C
16 75 70 70 65 65 60 55
20 80 755 70 70 65 60 60
25 85 85 85 80 75 75 70
32 100 95 90 85 80 75 70
40 110 110 105 100 95 90 85
50 125 120 115 110 105 100 90
63 130 135 130 125 120 115 105